Six months out: the planning timeline we give every couple
Most planning stress is not caused by having too little time. It is caused by making decisions in the wrong order.
Six months out
Guest count, budget ceiling and venue. Nothing else can be decided sensibly before these three, because all three constrain everything downstream.
Five months
Photographer and planner. The good ones book out first, and both need lead time to be useful rather than reactive.
Four months
Design direction frozen. Not sketched — frozen. Every week the concept stays open after this point costs money in re-fabrication.
Three months
Catering tasting, entertainment confirmed, outfits in production, invitations out.
Two months
Floor plans, seating logic, run sheet drafted, all vendor contracts signed.
One month
Final guest numbers, load-in schedule circulated, contingency plans agreed in writing.
The last week
Nothing new. Only confirmations. If something is being decided in the final week it has already gone wrong somewhere.